Estimates
Schroeder
Rotary Drilling and Pump Company is
proud to provide the highest quality products and service to our
customers. To serve your needs most effectively and to ensure that
your well and water system are exactly what you require, we provide
custom estimates rather than providing prices using a preset fee.
This is due to numerous considerations such as the many unknown
variables that can arise during the process of giving you access
to fresh groundwater such as the depth needed to reach water, the
distance from the electric meter and other structures to the well
location, and types of geological formations encountered during
drilling, to name just a few. This approach benefits you because
you only pay for the products and the labor actually required for
your unique water well system. Using the estimation method also
allows you to choose the pump brand, horse power, etc. that you
prefer to have us install, along with the opportunity to add any
special needs such as to run wiring that will serve to supply electricity
to a future heat source inside your soon-to-be-constructed well
house, for example.
The
selection of the pump
will also affect the
duration of your warranty,
which can be up to
5 years for parts
and labor. Estimate
totals vary depending
on the duration of
warranty selected.
We strongly urge our
customers to choose
the American made
pumps with the highest
warranty rather than
selecting the less
expensive and lower
warranty pumps.
We
will always recommend
the products that
best fit your needs,
whether it be for
a domestic well, a
water system, or for
a commercial concern.
In addition, our years
of experience of drilling
in this region of
Missouri enables us
to make good estimates
that are based precisely
on current material
costs along with factors
related to your specific
location, such as
its elevation, the
depths of neighboring
wells, and known geological
formations in your
area. However, you
must keep in mind
that each well that
is drilled is a unique
project, and as such,
though rare, occasionally
there may factors
that increase the
actual cost of the
project such as the
need to drill deeper
than anticipated,
for example, or perhaps
because the formations
actually encountered
during drilling may
be angled in such
a way that slabs will
slip sideways into
the bore hole causing
increased expense.
We make every effort
to inform you of all
possible liely scenarios
beforehand or as they
occur, whichever is
applicable, and are
always happy to answer
any questions and
address any concerns
before, during, and
after the drilling
process and water
system installation.
We believe firmly
in being honest and
upfront with you and
we value the importance
of providing clear
communication and
accurate information
to our customers.
Regarding
our estimation process, please read what one pleased customer had
to say... "Tom,
we are in the business of developing databases and application software
for other businesses. In our particular industry, the estimates
we make are much more difficult to get as close to the actual final
cost as yours was, particularly due to the way customers typically
want to add/change requirements and functionality to their software
development projects after the projects are already underway.
Based
on our own experience in making estimates, we were VERY impressed
with how accurate your estimation process was! Our estimate from
you was only SEVEN DOLLARS off from the actual cost! We were amazed
and quite pleased! Thank you for providing us with so much information
about the entire drilling process so that we could understand all
of the work and materials described on your estimate form. We also
wanted to let you know how much we truly appreciated your ability
to so closely estimate the costs associated with our well drilling
project. Very professional! We highly recommend your company to
anyone else in your service area who needs the type of services
your company provides." JMM and KAM
Tom
can also give you
multiple estimate
amounts in order to
illustrate all of
your options to you
before you make your
final decision. These
various estimate amounts
could include an estimate
of the cost of a water
system with different
warranty options as
well as showing the
difference in cost
between the pump horsepowers
you could choose from.
As another example,
he can give you an
estimate that includes
the cost of installing
casing all the way
to the bottom of the
well versus the cost
of installing the
casing for a only
certain number of
feet. Regardless of
what your final choices
are, he will explain
the advantages and
disadvantages of the
options available
to you before you
decide.
(To
see what the bill
after the job
is completed will
contain and to compare
it to the estimate
form, you can view
a scanned image of
a blank
billing statement
form.)
An
HTML version of our
Estimate
form is shown below
to provide you with
a clear picture of
the types of materials
that will be needed
for your well / water
system project to
be completed. Tom
Schroeder will visit
your site and talk
with you in person
to answer any questions
and to determine an
approximate location
for your well. At
that time, he will
also provide you with
a written estimate,
using the Estimate
form illustrated below:
|
| |
| |
|
Directions: |
| |
|
| |
|
| |
|
| |
|
| |
|
| Phone |
|
| Date |
|
|
Estimate
|
|
Qty./Size
|
Materials
|
Price
|
| |
Submersible
Pump |
|
| |
Schedule
80 Pump Pipe & Pump Cable |
|
| |
Schedule
80 Couplings |
|
| |
Check
Valve |
|
| |
Pitless
Adapter |
|
| |
Schedule
____ Water Line |
|
| |
Captive
Air Pressure Tank |
|
| |
Tank
Accessory Kit (Switch, Gauge, Valves) |
|
| |
Fittings |
|
| |
Underground
Wire |
|
| |
Digging
& Backfilling |
|
| |
Bury
Hydrant |
|
| |
Torque
Arrestors |
|
| |
Romex
wire |
|
| |
Breaker
& Disconnect |
|
| |
(Note:
The items above apply primarily to water systems)
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
| |
Drilling |
|
| |
6"
Schedule 40 PVC Casing |
|
| |
4
1/2" PVC Liner |
|
| |
Well
Cap, State Certification Fee, 6" x 10" Packer, 6 bags
Grout |
|
| |
(Note:
The items above apply primarily to wells)
|
|
| |
|
|
| |
|
Any
additional work not itemized above will be charged according
to material, time, labor and equipment over the estimate total.
|
|
|
Estimate
Total
|
$ |
(The
back of the Estimate form is shown below)
|
| This
agreement entered into on this day __________________, by and between
______________________, customer, and Tom Schroeder Rotary Drilling
and Pump Company, contractor, agree to the following terms:
- Contractor
shall perform the described work in accordance with the estimation
of, well usage by the customer, well depth, standing water level,
and formation used by contractor in preparing his estimate.
- Customer
agrees to pay contractor for the work described and performed,
the total price of $__________. Payment of this amount is subject
to increase to correspond to any changes in well depth, standing
water level, formations encountered, and/or change in desired
usage by customer, unknown to contractor at the time the estimate
was provided to the customer. If additional work or material are
required, customer agrees to pay contractor's unit price for all
additional materials/labor required.
Payment shall be made unto contractor on the date said work is
completed. If payment in full is not made within thirty (30) days,
contractor shall be entitled to include interest on said outstanding
balance at a rate of 1 1/2% per month (18% per annum), until such
amount is paid in full.
- Contractor
shall provide and pay for all labor, materials, equipment, including
tools and equipment necessary for the proper completion of the
work on the project.
- Contractor
represents and warrants to customer that all equipment and materials
used in the work and made a part of the structures of such work,
or placed permanently in connection with such work, will be new
unless otherwise specified in the contract documents, of good
quality, free of defects and conformity the contract document.
- Contractor
may employ sub-contractors to perform any of the above described
work as the contractor may deem necessary to complete said work.
- In the event
that contractor must file or pursue any legal action in relation
to this agreement, the customer shall be responsible for any and
all legal fees including court costs incurred by the contractor.
THIS AGREEMENT
shall be binding upon the customer, as well as the respective heirs,
personal representatives, successors, and assignees of the work.
___________________________
Customer Signature
NOTICE
TO OWNER
Failure of
this contractor to pay those persons supplying material or services
to complete this contract can result in the filing of a mechanic's
lien on the property which is the subject of this contract pursuant
to chapter 429, RSMO. To avoid this result you may ask this contractor
for "Lien Waivers" from all persons supplying material
or services for the work described in this contract. Failure to
secure lien waivers may result in your paying for labor and material
twice. |
|
|